Arkansas River Levee Work Expected to Resume in February

Glowing Cloud over City

Dusk falls over the Arkansas River Levee and downtown Pueblo on a summer evening. -Photo by Shanna Lewis

The Pueblo Conservancy District is moving forward to find a contractor for the next phase of work to repair the Arkansas River Levee.

Contractors will need to remove 12 feet of dirt and concrete from the top of the existing levee. Consulting engineer Kim Kock says some of the material will be used to build an extension to the levee on Wild Horse Creek, which flows into the Arkansas.

“The dirt will come off to use on Wild Horse first,” says Kock, “and the remainder can be used for whatever purpose the contractor who gets the bid has for it.”

Several projects could use the excess soil, including a marijuana grow operation and the construction on I-25. Proceeds from the reuse of the extra dirt, enough to fill two football fields ten feet high, will be used to offset the cost of the levee reconstruction.

Work on the levee is expected to resume in February.

Listen to the story: Arkansas River Levee Work Expected to Resume in February

This entry was posted in KRCC, Radio, Reported Story and tagged , , , , . Bookmark the permalink.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s